- NNPC/Mobil Oyot wellhead platform on low bed at Dorman Long NND facility during loadout
NNPC/Mobil Oyot wellhead platform gradually being rolled onto the barge. Nigerian content working
NNPC/Mobil Oyot wellhead platform safely loaded for the final sail-away. Nigerian still progressing
Commendation Letter
FROM THE MEDIA. EXTRACT FROM NIGERIAN CONTENT WATCH
EXTRACT FROM NIGERIAN CONTENT WATCH
AGIP Separator2
Anchor Suction 5 m dia Pile
Bacita Sugar Refinery
Chevron Flare Knockout Drum
CHEVRON Helideck Intermediate Support Structure
CHEVRON Meji Helideck
Chevron's Abiteye Vessel 002
COCA COLA Finished Highest Xmas Tree in Africa
COCA COLA Frame for Highest Xmas Tree in Africa
CRAN#DEA
Crane Beams & Legs for STREET CRANES Ltd (UK)
DANGOTE Sugar Refinery
Exxon Mobil Underwater Drilling Template
EXXON Scrubber
EXXONMOBIL Load Out of Modu Pile for the Ehra project
EXXONMOBIL Pig Launcher nearing completion
IMTECK VONK Skid Assembly
JULIUS BERGER - Some of 100 tanks manufactured for Barge Installation
MERCEDES BENZ New Nigerian HQ
Niger Bridge
NIGERDOCK Workshop Steel Structure
NLNG Train 3 Structures in Manufacture
NLNG Train 3 Vessel on Load Out
NLNG Train 3 Vessel on Load Out 2
NNPC Butanisation Vessels
NNPC Butanisation Vessels Installed
PC190014
Roof Structure for Trem Church
SAIPEM Vessel Load Out
SHELL Bonga Buoy under Construction
SHELL Forcados Yokiri Fixed Platform
SHELL Gbaran Ubie Field Vessel
SHELL Manifold Skid
SHELL Manifold Skid Base
SHELL Santa Barbara Manifold Skid for Gbaran Ubie Field
SHELL Sea Eagle Separator
SHELL Sea Eagle Separator Internals 2
SHELL Sea Eagle Separator Internals 3
TOTAL - Air Vessels 1
TOTAL Aviation Fuel Tank
TOTAL Suction Drum
West African Portland Cement - Stacks
SHELL GBARAN UBIE VESSELS Completed 2009
CHEVRON ABITEYE PRESSURE VESSEL 2009
Flare Knock-Out Vessels for various Flow Station Safety Upgrades Contractors: KCC/HHI 2005
OFON SS CLAD VESSELS LOAD OUT - 2010